DESIGN PHASE 1. Load demands placed on input output modules. 2. Allocate digital and analogue input or outputs to devices and electrical termination cross references. 3. Design network communications. 4. Design PLC layout. 5. Define naming conventions. 6. Interpret Piping and Instrumentation Drawings (P&ID's)
7. Interpret and provide feedback on functional descriptions
8. Interpret electrical drawings and provide feedback on interface circuits.
9. Liaise with end user on the operational feel of plant.
Programs built in languages that meet client needs
BUILD PHASE
1. Write PLC program to meet requirements of the design phase
2. Write HMI program to meet requirements of the design phase
3. Guide electrical services on electrical terminations.
4. Write operational manuals
Installation Testing and Handover
COMMISSIONING PHASE
1. Card/module installation (racks installed by electrical services)
2. Cross patching of Cards/Modules to terminal blocks
3. Circuit testing
4. Input operational variables and debugging
5. Trial plant runs
6. Manual and software handover